Calculate/Convert
  • Amperes when kVA is known
  • Converting kVA to kW
  • Converting kW to kVA
  • Converting kW to HP
  • kVA Required to run motors
  •  

    FG Wilson Generator, Perkins Generator, Cummins Power generation, SDMO Generator, cummins Generator,FG Wilson Generators, Perkins Generators, SDMO Generators,cummins logo, cummins engine, sdmo logo, sdmo generator, perkins engine, fg wilson diesel generator, fg wilson logo

    power protection services

    Generator Power Calculator

     

    If you require any assistance with this power calculator or what generator will best suit your requirements, do not hesitate to contact us. Click here

    Click here for Power Consumption Calculator?

    To calculate these please click here?

    • Amperes when kVA is known
    • Converting kVA to kW
    • Converting kW to kVA
    • Converting kW to HP
    • kVA Required to run motors

    Generator Size to Start Motors

    Instructions: Fill in the HP of the motor(s) in their starting sequence, select the start method (DOL - Direct On Line or Star Delta) and press Calculate. The required generator size will then be displayed at the bottom.

    3 Phase (415 volt @ 50Hz)
    1 Phase (240 volt @ 50Hz)

    Starting Sequence Motor HP Start Method
    DOL / StarDelta
    Run Variable Phase Current Starting Value Total
    Run
    Current
    Total
    Start
    Current
    1 /
    2 /
    3 /
    4 /
    5 /
    6 /
    Generator Size for Starting with: kVA*
    Generator Size for Running with: kVA*
    Generator Size Recommended: kVA*

    * Please NOTE the above calculations are an estimate only because other factors such as site conditions, motor efficiencies and iron losses are not taken into consideration.

    Generator Selection

    The generator size must be equal or greater than the total consumption of all applications. The higher starting requirement must he taken into account accordingly. To maximise the generator potential, the largest electrical motor should be started on its own and further appliances should only be switched on thereafter.

     

     